Water losses reduction and digitalization in the province of Frosinone

Riduzione perdite e digitalizzazione in provincia di Frosinone Riduzione perdite e digitalizzazione in provincia di Frosinone

Involved municipalities:



Anagni, Alatri, Ferentino, Frosinone, Veroli, Sora, Ceccano, Pontecorvo, Cassino, Cervaro

Timetable 

 

• Start: January 2024

• End: April 2026

Description and goals

 

The adherence to the project is driven by important values, aimed at respecting the water resource as an essential pillar to ensure a sustainable future by adopting conservation and efficient management practices, as well as protecting ecosystems.

Without losing sight of the protection of future generations, we make investments aimed at reducing water consumption and renewing the water infrastructure. By using advanced technologies, we aim to revolutionise water management in the territory and project ourselves into a future of innovation and sustainability. 

1.

 

Respect for water resource

2.

 

Protection of future generations

3.

 

Sustainability

Water networks and concerned population

~1 .600 km

Districtualisation of the networks

~98 .000

Users

~240 .000

Inhabitants

Main expected targets

857,09 km
Districtualised

35 km
Water reclamations

26 Mln mc/anno
Lost volume recovery

8.300 TEP/anno
CO2 emissions recovery