Municipalities involved:
Rome: municipalities I - III - IV - V - VI - X -XV
Ariccia, Colonna, Fiumicino, Frascati, Grottaferrata, Monte Compatri, Monte Porzio Catone, Nemi, Rocca di Papa, Rocca Priora, San Cesareo, Velletri, Zagarolo
Timetable
• Start: January 2021
• End: January 2026
The project is aimed at reducing loss in water distribution networks, through digitalisation and monitoring of the networks. It contains a set of measures ranging from the survey and georeferencing of water networks, to the installation of smart instruments for measuring flow rates and pressures, to the districting and hydraulic modelling of the networks, to the installation of pressure control valves, to the pre-localisation of leaks, to extraordinary maintenance interventions and replacement of sections of water networks, to smart metres for measuring user volumes.
District distribution of networks
Network rehabilitation
Leak detection
2.800 km
Districted
68 Mln mc/anno
Recovery of lost volume
4.614 TEP/anno
Missed CO2 emissions
10.486 MWh/anno
Energy saving
Results achieved compared to targets
Data update to December 2024
> 62% of networks divided into districts
37% of networks reclaimed
~ 55% of loss detection conducted on relevant network kilometers
Overall cost of intervention: 99.940.665 €